A55 Llanddulas

Client:
National Assembly for Wales Transport Directorate
Contract Value:
£3.9m
Contract Date:
2005
Location:
Conwy

Work was carried out on the A55 trunk road between Llanddulas and Pensarn – the only remaining section of the A55 that failed to meet carriageway standards.

The scheme increased the lane widths to current standards, and included the creation of a hardened central reservation, improved drainage and additional communication ducting.

The whole carriageway construction was replaced and finished with thin-coat SMA surfacing course to reduce road noise and improve surface drainage.

Extensive “soft-spots” were found under the existing carriageway, which extended the contract into the period of heavy summer traffic, but careful traffic management allowed two lanes to stay open on both the eastbound and westbound carriageway – preventing serious traffic congestion.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together