Client: FIM Services Ltd
Contract value: £543k
Contract date: 2010 – 2011
Capabilities:
Energy & Renewables Energy & renewables Slurry Lagoons
Design and construct balance of plant civils and electrical infrastructure for three Gamesa 850KW turbines.
The site is located in farmland near the town of Torrington, Devon, and is situated above a water supply reservoir. Strict environmental controls were required to ensure containment of silt run-off from site construction operations, which proved successful – despite the majority of the construction works being carried out over the wet winter period.
Works included: