Deganwy Marina Construction

Client:
Lifetime Projects Ltd
Contract Value:
£3.3m
Contract Date:
2003
Location:
Deganwy Marina

A boating marina was built adjacent to an existing quay, as part of a prestige housing and hotel complex.

The work involved:

  • Construction of a rock breakwater projecting 170m into the environmentally sensitive River Conwy estuary
  • Formation of 70m x 250m sheet steel pile containment structure
  • Excavation to formation level within the steel-piling box, with unsuitable estuarine silt being removed from site to tip
  • Use of sand and gravel to raise the level of the surrounding development land

A pre-cast concrete harbour wall surmounting the piling was completed with an insitu concrete capping beam.

In addition, a dock gate was constructed along with new access roads, a level crossing and associated drainage and infrastructure works.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together