Hall Farm Wind Farm

Hall-Farm

Client: Ridgewind Ltd
Contract value:
£5m
Contract date:
2012 - 2013
Capabilities:
Energy & Renewables Energy & renewables Slurry Lagoons

Balance of plant civils and electrical infrastructure for 12 Repower 2.05MW turbines.

The site is located approximately 5.5km north of Beverley, near Hull.

Major activities included:

  • Design and construction of 6.5km of site access tracks
  • Construction of 12 concrete turbine bases, each on 350mm square driven piles
  • Construction of 12 crane pads measuring 45m x 30m
  • Construction of substation and control building
  • 7km of on-site cable trenching/laying
  • 4.5km of off-site cable trenching along s public highway to the point of connection
  • Design and construction of 16m span steel bridge with timber decking to cross Holderness drain
  • Electrical infrastructure installation by specialist partner
  • Landscaping and reinstatement work
info@jones-bros-ruthin.co.uk
civeng@jones-bros-ruthin.co.uk
southern@jones-bros-ruthin.co.uk
scotland@jones-bros-ruthin.co.uk