Balance of plant civils and electrical infrastructure for 11 Vestas 2.0MW turbines.
Major activities included:
- Design and construction of site access tracks including gas pipeline protection works
- Engineered upfill works to all turbine foundations
- Construction of concrete turbine and crane pad foundations using locally sourced steel and concrete
- Construction of a substation building
- Construction of two new Section 278 highway entrances
- 6km of cable trenching
- Electrical infrastructure design and installation by our specialist partner
- Permanent met mast installation
- All landscaping and reinstatement work