Tullo windfarm Infrastructure

Client:
Eneco
Contract Value:
£3.88m
Contract Date:
2009 – 2010
Location:
Tullo

Work on the seven-turbine windfarm, in an environmentally sensitive area included:

  • Design and construction of access tracks
  • Design and construction of concrete turbine bases and crane pads
  • Design and construction of substation building and fit out
  • Design and cable laying and electrical fit out, including installation of transformer housings for each turbine
  • Highway improvements to accommodate deliveries

Working alongside its design team of Mott MacDonald and Powersystems, Jones Bros successfully completed the construction of seven turbine bases, of which one was a piled foundation design for added support to the foundation loads.

The substation work also included design and build of substation building, as well as preparation of the area for the installation of transformers and several pieces of grid compliance equipment.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together