Deganwy Marina Construction

Deganwy Marina Construction

Deganwy Marina Construction, Conwy, North Wales

Client: Lifetime Projects Ltd
Contract value:
£3.3m
Contract date:
2003
Capabilities:
Coastal & Marine Infrastructure Coastal & marine infrastructure Projects

A boating marina was built adjacent to an existing quay, as part of a prestige housing and hotel complex.

The work involved:

  • Construction of a rock breakwater projecting 170m into the environmentally sensitive River Conwy estuary
  • Formation of 70m x 250m sheet steel pile containment structure
  • Excavation to formation level within the steel-piling box, with unsuitable estuarine silt being removed from site to tip
  • Use of sand and gravel to raise the level of the surrounding development land

A pre-cast concrete harbour wall surmounting the piling was completed with an insitu concrete capping beam.

In addition, a dock gate was constructed along with new access roads, a level crossing and associated drainage and infrastructure works.