Jones Bros Civil Engineering UK’s place on a waste management and landfill framework has got off to a flying start. The family firm has already completed four projects on behalf of Viridor, a recycling, renewable [read more]
Work on the final section of a vital link road has been started by Jones Bros Civil Engineering UK. The design and build contract is for the fourth phase of Llangefni Link Road, in the [read more]
Infrastructure improvement works including land reclamation, earthworks and surfacing to improve the site layout, and safety at Holyhead Port is being carried out by Jones Bros Civil Engineering UK. The project will improve the service [read more]
Snow and other wintry conditions have failed to slow work constructing infrastructure at Brenig wind farm. Construction of the concrete foundations for the 16-turbine scheme, was finished two weeks ahead of the planned programme. Now, [read more]
Jones Bros Civil Engineering UK has finished works on the A51 as part of infrastructure for a £100m industrial park. A team of 10 from Jones Bros has been on site for 4 months installing [read more]
The bespoke concrete base for a pioneering underwater renewable energy project is set to be floated across the coast of North Wales. The structure, which is part of a €30m (£25m) underwater kite project off [read more]
The final turbine has been erected at Pen Bryn Oer Wind Farm in South Wales. Contractor Jones Bros Civil Engineering UK is now carrying out reinstatement work on the site ahead of the three-turbine wind [read more]
Neolithic and medieval remains have been found by local people at one of the UK’s biggest archaeological digs, set up by Jones Bros. The Ruthin-based civil engineering firm organised 40 separate digs with joint venture [read more]
The Clyde extension wind farm project has received an international environmental award. The 54-turbine scheme, which is owned by Clyde Wind Farm (Scotland) ltd has won a Green Apple Award for environmental best practice. The [read more]