Contractor Jones Bros Civil Engineering UK is 50 per cent of the way through its highways project to provide access to a new Employment park in Cheshire. The civil engineering company is installing a roundabout [read more]
Brisk progress is being made on preparatory works at Brenig wind farm. All the access tracks and crane pads have been constructed, and the earthworks for foundations completed one month ahead of schedule, at the [read more]
A pioneering gravity base structure that will play a vital role in the trial of a ground-breaking underwater renewable energy project is 50 per cent complete. The concrete base, part of the €30m (£25m) underwater [read more]
Underwater divers were called in by Jones Bros to help build new quayside infrastructure for the biggest offshore wind farm in the world. The specialist contractors were called in to fix steel columns to a [read more]

Reinstatement works on one of Scotland’s biggest current wind farm sites are nearing completion. The balance of plant at Clyde wind farm extension, has been delivered by Jones Bros Civil Engineering in a joint venture [read more]
Work has been completed on the construction of two engineered landfill cell projects for client Augean South Limited. Jones Bros was appointed by the leading hazardous waste management company to carry out works at two [read more]
Jones Bros Civil Engineering has been awarded a place on a major waste management and landfill framework. The family firm secured the contract, awarded by Viridor, a recycling, renewable energy, and waste management company, to [read more]

A cement-lime stabilisation technique is eliminating the need for 800 vehicular journeys to and from the site of one of Jones Bros’ latest wind farm projects. The technique, to prepare ground for tracks and crane [read more]