Balance of plant civils and electrical infrastructure for 5 Vestas 2.0MW turbines. Work included: Decommissioning of eleven existing turbines that formed one of the UK’s first commercial wind farms over…
Balance of plant civils and electrical infrastructure for 11 Vestas 2.0MW turbines. Major activities included: Design and construction of site access tracks including gas pipeline protection works Engineered upfill works…
Balance of plant civils and electrical infrastructure for 10 Repower 2.0MW turbines. Major activities included: Design and construction of 7km of site access tracks Construction of concrete turbine and crane…
Balance of plant civils and electrical infrastructure for 11 Gamesa 850KW turbines. Major activities included: Construction of 4.5km access tracks using site won stone from onsite borrow pit Construction of…
Balance of plant civils and electrical infrastructure for 12 Repower 2.05MW turbines. The site is located approximately 5.5km north of Beverley, near Hull. Major activities included: Design and construction of…
Balance of plant civils and electrical infrastructure for six Repower 2MW turbines. Major activities included: Design and construction of site tracks including swept path analysis Construction of wind turbine foundations…
Balance of plant civils and electrical infrastructure for 12 Vestas 850KW turbines at Lochgilphead near Argyll. Major activities included: Design and construction of site access tracks, including 3km of floating…
The 140MW windfarm project involved the design and construction of the civil and electrical infrastructure to allow the installation and commissioning of 60 Siemens 2.3MW wind turbine generator systems (WTGs).…
A control building was designed and constructed to serve as the main control depot for the Fred Olsen Renewables operations team, responsible for maintaining wind turbines on the Crystal Rig…
Phase one of the project involved all works associated with the installation of three 1.3MW Siemens wind turbine generators. This included upgrading county roads and installing new site access tracks,…